|
Last Modified: 11-29-2007 |
1.6 A |
|
Service Category: Engine/Hybrid System |
Section: Emission Control |
|
Model Year: 2008 |
Model: Sequoia |
Doc ID: RM0000030WI005X |
|
Title: 3UR-FE EMISSION CONTROL: PURGE VALVE: INSTALLATION (2008 Sequoia) |
INSTALLATION
1. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY
|
(a) Install the No. 1 vacuum switching valve assembly with the bolt.
Torque: 21 N·m (214 kgf·cm, 16 ft·lbf)
|
(b) Connect the connector.
2. CONNECT PURGE LINE HOSE
(a) Connect the 2 hoses.
HINT:
Turn the clip claw to the upper side.
3. INSTALL V-BANK COVER SUB-ASSEMBLY
|