Last Modified: 11-29-2007 1.6 A
Service Category: Engine/Hybrid System Section: Emission Control
Model Year: 2008 Model: Sequoia Doc ID: RM0000030WI005X
Title: 3UR-FE EMISSION CONTROL: PURGE VALVE: INSTALLATION (2008 Sequoia)

INSTALLATION

1. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY


(a) Install the No. 1 vacuum switching valve assembly with the bolt.

Torque: 21 N·m (214 kgf·cm, 16 ft·lbf)

(b) Connect the connector.

2. CONNECT PURGE LINE HOSE

(a) Connect the 2 hoses.

HINT:

Turn the clip claw to the upper side.

3. INSTALL V-BANK COVER SUB-ASSEMBLY 3UR-FE INTAKE / EXHAUST: INTAKE MANIFOLD: INSTALLATION (2008 Sequoia)+